Skip to content
Testnet vibesContracts aren't deployed yet — every number here is simulated, not on-chain.

Your hall

Cards fill racks. Racks fill rooms. Both run out, and the power feed runs out before either. Everything you burn to get past those limits is $GPU that never comes back.

Racks waiting

Drag one onto a free tile
  • Pod rack
    Pod11/48 bays20.0 kW · 4 tiles
  • Bay rack
    Bay6/20 bays8.0 kW · 2 tiles
  • Tower rack
    Tower3/8 bays3.0 kW · 1 tile
  • Shelf rack
    Shelf2/4 bays1.5 kW · 1 tile

Closet

Level 1
Floor tiles0/2
Racks standing0
Grid feed4.0/4.0 kW
Daily bill19,097 GPU
101%

The rate is not fixed. It is set so 55% of everything emitted gets burned, whatever the price does.

Ready to claim1284.61$GPU
Room levels
Closet2 bays4 kW
Server room4 bays10 kW
Machine hall8 bays24 kW
Data centre16 bays60 kW
Campus32 bays150 kW

Referrals

10% of what they mine

Anyone who starts from your link earns you 10% of everything they mine, for as long as they mine it. It costs them nothing — their rewards are untouched.

Connect a wallet to get your link.

Miners you brought
Earned from referrals $GPU
Referral pool remaining20M

The 10% is paid from a dedicated 20M slice of the fixed supply — not minted on top, and not deducted from your referee. The hard cap is unchanged; the mining pool is smaller by exactly that much.

What $GPU buys

All of it is burned

Cooler

99k $GPU

−20% watts for every card in the rack, permanently

Takes a rack bay of its own. Buys headroom in the limit that actually blocks you.

Overclock

69k $GPU

+25% compute for 7 days

Burns life faster than it adds output. A bet on the current epoch, not an upgrade.

Warranty

2.40 NVDA

Restores a worn card to full life

Paid in NVDA, so it lifts the floor instead of burning supply. Adds no watts.

Next halving

5 nm4 nm
29.6%
Your share of hashrate8.26%
Mined so far118.4M
Halves at400M
Hard cap800M

Electricity halves with the reward, so margins survive the cliff. No countdown — the halving lands when supply crosses the line.