Testnet vibesContracts aren't deployed yet — every number here is simulated, not on-chain.
Your hall
Cards fill racks. Racks fill rooms. Both run out, and the power feed runs out before either. Everything you burn to get past those limits is $GPU that never comes back.
Racks waiting
Drag one onto a free tile
Pod11/48 bays20.0 kW · 4 tiles
Bay6/20 bays8.0 kW · 2 tiles
Tower3/8 bays3.0 kW · 1 tile
Shelf2/4 bays1.5 kW · 1 tile
Closet
Level 1
Floor tiles
0/2
Racks standing
0
Grid feed
4.0/4.0 kW
Daily bill
19,097 GPU
101%
The rate is not fixed. It is set so 55% of everything emitted gets burned, whatever the price does.
Ready to claim1284.61$GPU
Room levels
Closet
2 bays
4 kW
Server room
4 bays
10 kW
Machine hall
8 bays
24 kW
Data centre
16 bays
60 kW
Campus
32 bays
150 kW
Referrals
10% of what they mine
Anyone who starts from your link earns you 10% of everything they mine, for as long as they mine it. It costs them nothing — their rewards are untouched.
Connect a wallet to get your link.
Miners you brought
—
Earned from referrals
— $GPU
Referral pool remaining
20M
The 10% is paid from a dedicated 20M slice of the fixed supply — not minted on top, and not deducted from your referee. The hard cap is unchanged; the mining pool is smaller by exactly that much.
What $GPU buys
All of it is burned
Cooler
99k $GPU
−20% watts for every card in the rack, permanently
Takes a rack bay of its own. Buys headroom in the limit that actually blocks you.
Overclock
69k $GPU
+25% compute for 7 days
Burns life faster than it adds output. A bet on the current epoch, not an upgrade.
Warranty
2.40 NVDA
Restores a worn card to full life
Paid in NVDA, so it lifts the floor instead of burning supply. Adds no watts.
Next halving
5 nm → 4 nm
29.6%
Your share of hashrate
8.26%
Mined so far
118.4M
Halves at
400M
Hard cap
800M
Electricity halves with the reward, so margins survive the cliff. No countdown — the halving lands when supply crosses the line.